TAST tool Menu
TAST Adaptors
Adaptors examples
TAST Integrations
Interesting features
Documentation of technical administration
Modeling recommendations
Training in the TAST tool
TAST tool Menu
TAST Adaptors
Adaptors examples
TAST Integrations
Interesting features
Documentation of technical administration
Modeling recommendations
Training in the TAST tool
This is an old revision of the document!
TAST can upload test evidences and results to ALM in order to integrate both tools.
TAST requires some parameters to be able to connect with ALM. This parameters should be specified in the application properties. The following keys are required:
ALM integration is linked with the TAST test set. Once ALM integration is configured via application properties file, TAST will check ALM availability while loading the page TS Management. If the check is OK, the user will be able to configure the ALM domain, project and folder, where TAST will upload results and evidences,during the process of creation/edition of Test Sets.
Steps
1. To upload results an evidences to ALM the user has to check the Upload to ALM option.
2. When selected, this option will allow us to select a Domain in ALM, then a Project of this Domain and finally a Folder inside that project to store the Test Set in ALM.
3. Once the Test Set is saved the user will not be able to change the ALM information.
4. After the execution of the Test Set, the results will be available in ALM.